GE - Roper Energy
Energy Savings Case Study
General Electric (GE) is an American multinational conglomerate corporation incorporated in Schenectady, New York and headquartered in Fairfield, Connecticut in the United States. EIS performed a number of installation for GE facilities, including an installation located in GE's Roper stove manufacturing plant in North Georgia. The results to date have been outstanding, exceeding the promised savings level by almost 30%.
Subject Information
Facility: GE - Roper
Facility Type: Manufacturing - Appliances
Facility Size: 1,200,000 sq. ft.
Savings Analysis
Projected
Actual
Monthly Savings
10.1%
21%
Payback Period
27 months
11 months
Technology Used
EASI Liners, PowerLiners, Lighting Upgrades, EIS Optimizer, Elspec, Frigi‐Tech
Annual Environmental Benefits
-
4,368,000 lbs CO2
-
1,625 barrels of oil
-
1,233 tons of coal
-
32,980 lbs of SO2
-
Equivalent to removing 406 vehicles
Additional Benefits
-
Motors run cooler
-
Improved lighting quality
-
Standardized lighting in the entire facility
-
No special training or employee involvement
-
Increased electrical capacity
CASE STUDIES
"The planning was very thorough, and the execution was flawless."
Plant Engineer, Mondelez International
News
Energy Integrated Solutions, Inc. (EIS)
1040 Boulevard SE, Suite D
Atlanta, GA 30312 USA
Office:
404-937-6547